Every fee the Water Division charges, as adopted in the City Code. Work billed on a time and materials basis is charged at $55 per hour for a plumber, $50 per hour for labour and $55 per hour for equipment, plus materials.

Water Division service charges

§ 250-2

Work billed on a time and materials basis is charged at $55 per hour for a plumber, $50 per hour for labor and $55 per hour for equipment, plus materials.

ServiceCharge
Chlorination tap $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Dig and replace curb box $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Dig and replace gate box $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Full renewal $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Main pipe leak $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Service leak, inside or out $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
New service, complete $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
New service, curb to cellar $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
New service, main to curb $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Renewal, main to curb $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Renewal, curb to cellar $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Valve change $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Tap $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Punch corporation $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Discontinue service $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Relocate service $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Service call $55/hr plumber · $50/hr labor · $55/hr equipmentTime and materials
Turn on, new service $60
Turn on $42
Turn off $42
Turn on, seasonal $42
Turn off, seasonal $42
Transfer read $60
Second transfer read $36
Reseal meter $50
Test meter, 1.5" and smaller $60
Insufficient check charge $35
Deduct inspection $30
Sprinkler application $30
Hydrant flow test $250
Hydrant permit Plus metered usage and a refundable equipment deposit$50

Unauthorized use and connection

§ 250-2

Each charge below is in addition to time, materials and the estimated value of the water used.

ViolationCharge
Unauthorized use — first offense $150
Unauthorized use — subsequent $250
Unauthorized connection — first offense $150
Unauthorized connection — subsequent $250
Unauthorized meter change — first offense $150
Unauthorized meter change — subsequent $250
Unauthorized meter removal — first offense $150
Unauthorized hydrant use — first offense $150
Unauthorized hydrant use — subsequent $250
Unauthorized service or main turn on/off — first offense $250
Unauthorized service or main turn on/off — subsequent $250

Water service entrance fees

§ 250-2(B)

Applies to renovations and new services. For non-residential properties the number of units is the design flow divided by 330 gallons per day, using Title 5 design values (310 CMR 15.000).

Meter sizePer unit
1" or smaller $400
1.5" $400
2" $400
4" $400
6" $500
8" $1,000
10" and 12" $1,200

Water service application fees

§ 250-2(B)
SizeFee
1" or smaller $120
1.5" $400
2" $600
4" $800
6" $1,000
8" $2,000
10" $2,400
12" $2,400

Main pipe extension fees

§ 250-2(B)
SizeFee
4-inch $400
6-inch $500
8-inch $1,000
10-inch $12,000
12-inch $12,000

Water supply fee

§ 250-2(C)

Paid to connect to the municipal water system. These funds defray the cost of maintaining, protecting, improving, developing and expanding the water supply system.

Meter sizeFee
1" or less $3,000
1.5" $4,500
2" $6,000
3" $9,000
4" $12,000
6" $18,000
One-family dwelling on a single non-contiguous Form "A" lot Exception to the schedule above$1,000
Second unit of a two-family dwelling on a single non-contiguous Form "A" lot The first unit is subject to the standard fees$1,000

Annual fire service fee

§ 250-2(B)
SizePer year
2-inch $400
4-inch $500
6-inch $600
8-inch $720
10-inch $960
12-inch $1,200

Road replacement fees

§ 250-2(B)
TypeCost
Without infrared Per 2′ × 2′ × 5′$12
With infrared Per 2′ × 2′ × 5′$52
Cement sidewalk Per square foot$25

Cross connection program fees

§ 250-15
TaskRate
Backflow initial test — commercial $85
Backflow initial test — residential $10 for a second device at the same location$35
Backflow test — commercial $85
Backflow test — residential $10 for a second device at the same location$35
Backflow service call $55/hr labor · $65/hr equipment, plus materialsTime and materials
New water main chlorination and disinfection testing $100
Water system analysis $400
Water infrastructure fee Per unit$400

Water laboratory analysis fees

§ 250-3
ServiceFee
Laboratory analysis Call the Water Treatment Plant at (978) 374-2385Varies by test

Plan review

§ 250-2(D)
ServiceFee
Definitive subdivision, site and water main extension plans submitted more than twice Plus any expenses incurred to complete the additional review$100/hr

Hydrant permits

Permit fee
$30
Refundable deposit
$300

Available when water is not obtainable from another source. Usage is metered and billed, and the equipment must be returned for a final reading.

The deposit covers the meter and backflow equipment and is refunded when it is returned. Call (978) 374-2368.

Having your meter tested

Test fee, 1 inch and smaller
$50.00

For meters 1 inch and smaller. Refunded if the meter tests fast or falls outside AWWA standards. The test bench is certified by the Commonwealth of Massachusetts Division of Standards.

Submit a written request to 125 Amesbury Road, Haverhill, MA 01830.

Fees are reproduced from Chapter 250 of the Haverhill City Code. Confirm current amounts with the Billing Office on (978) 374-2370 before relying on them for a project budget.